Bond 2026
Bond 2026
Investing in North Bellmore
On September 10, 2026, the North Bellmore Board of Education adopted a proposed $26.5 million capital bond to address important facility needs across our schools, with no additional cost to taxpayers. If approved by voters on December 3, 2026, work would begin in Summer 2027.
No Additional Cost to Taxpayers
The proposed bond is structured to be completed at no additional cost to taxpayers. Existing budget capacity, retiring debt and anticipated New York State Building Aid support the proposed capital plan.
- No Additional Cost to Taxpayers
Join us for more information at one of the dates below!
|
Date |
Group / Meeting |
Time / Location |
|
October 13, 2026 |
PTA Coordinating Council (PTACC) |
7:30 PM (Virtual) |
|
October 15, 2026 |
Board of Education |
7:30 PM (Martin Avenue) |
|
October 19, 2026 |
SEPTA |
7:30 PM (Martin Avenue) |
|
October 20, 2026 |
Martin Avenue PTA |
7:30 PM (Martin Avenue) |
|
October 26, 2026 |
Park Avenue PTA |
7:30 PM (Park Avenue) |
|
November 10, 2026 |
PTA Coordinating Council (PTACC) – Martin Avenue |
7:30 PM (Martin Avenue) |
|
November 12, 2026 |
Board of Education |
7:30 PM (Martin Avenue) |
|
November 16, 2026 |
SEPTA |
7:30 PM (Martin Avenue) |
|
November 17, 2026 |
Newbridge Road PTA |
7:00 PM (Newbridge Road) |
|
November 18, 2026 |
John G. Dinkelmeyer PTA |
7:30 PM (JG Dinkelmeyer) |
|
November 18, 2026 |
Saw Mill Road PTA |
7:30 PM (Saw Mill Road) |
|
December 3, 2026 |
Bond Referendum |
Proposed Improvements
The proposed capital bond includes improvements throughout the District, including:
Roofs and Other Building Work
Roof replacement at all six schools, decommissioning of fuel tanks and selected building work. Totaling $13.87M
Gymnasium Air Conditioning
Gymnasium air conditioning at five schools and replacement of the Martin Avenue rooftop unit. Totaling $4.05M
Safety, Security, and Accessibility
Improved security and building access, secure entry vestibules and ADA elevators for second-floor access. Totaling $5.40M
Site Work
New playground additions with ADA accessible features; enhanced/expanded bench seating, bleacher seating for spectators, backstops. Totaling $3.18M
Total Proposed Capital Bond
Investing in priority facility improvements across all six schools totals $26,500,000.
Frequently Asked Questions
Have additional questions? Contact us and we’ll be happy to help!
-
North Bellmore UFSD is proposing a $26.5 million capital bond for priority facility improvements across all six schools. The proposal includes roof replacement and other building work; safety, security and accessibility improvements; gymnasium air conditioning at Martin Avenue, J.G. Dinkelmeyer, Newbridge Road, Park Avenue and Saw Mill Road schools; new playground additions with ADA accessible features at every school except Gunther; and field improvements at all six schools.
-
North Bellmore's six school buildings date from 1924 to 1957. The proposed capital bond represents the next phase of the District's long-term capital plan to address important facility needs and continue maintaining our schools.
-
The proposed capital bond includes major roof work across all six schools; air conditioning installation in five gymnasiums; safety and security improvements, including interior and exterior door hardware; elevators at Saw Mill Road and J.G. Dinkelmeyer; playground additions; field improvements, including benches, bleachers and backstops; select window replacements at Newbridge Road; and fuel oil tank abandonment.
-
The proposed capital bond is $26.5 million.
-
No. The proposed $26.5 million capital bond has been structured so the District can complete these improvements without any additional cost to taxpayers. Existing budget capacity, retiring debt and New York State Building Aid will support the cost of the proposed bond.
-
The District has structured the proposed bond using existing budget capacity, debt that is rolling off and New York State Building Aid. These existing financial resources allow the District to take on the new debt without increasing the tax levy to pay for the proposed bond.
-
North Bellmore's current Building Aid ratio is 78.7%. Eligible project costs approved by the New York State Education Department may qualify for State Building Aid based on the applicable aid calculation. The 78.7% ratio does not mean that the State will reimburse 78.7% of the entire $26.5 million bond.
-
The proposed projects were identified through the District's long-term capital planning process, including its Building Condition Surveys, review of facility conditions and collaboration among District administration, facilities staff, the District's architect and construction manager.
-
The District uses several funding sources for capital improvements. Smaller and recurring projects can be addressed through the annual budget or Capital Reserve, while larger, long-term projects may require bond financing. The proposed bond allows the District to address major facility needs while continuing its multi-year capital plan.
-
If approved by voters, work is anticipated to begin in summer 2027. The construction schedule will be developed to complete projects efficiently while minimizing disruption to students and staff.
-
No. Bond funds are specifically authorized for the capital improvements approved by voters and cannot be used to support the District's general operating budget.
-
No. The District cannot spend more than the amount authorized by voters for the proposed capital bond. If project costs exceed available funding, the District would need to adjust the scope or identify another legally permissible funding source.
-
Additional information, including the proposed improvements, presentations, frequently asked questions and upcoming community meeting dates, will be available on the District's Bond 2026 webpage. Residents are encouraged to attend upcoming presentations to learn more and ask questions.
-
Date: December 3, 2026
Time: 6 a.m. to 9 p.m.
Location: Newbridge Road Elementary School
|
December 3, 2026 |
Design and NYSED Review |
Summer 2027 |
Late Fall 2028 |
|
Voter referendum |
Design, approvals and bidding |
Work commences |
Work continues through late fall 2028 |
Residents are encouraged to learn more about the proposed capital bond by:
- Attending community information presentations
- Reviewing materials posted on this website
- Contacting the District with questions
Additional information will be added to this page as it becomes available.
Date: December 3, 2026
Time: 6 a.m. to 9 p.m.
Location: Newbridge Road Elementary School
-
December 3, 2026
Design and NYSED Review
Summer 2027
Late Fall 2028
Voter referendum
Design, approvals and bidding
Work commences
Work continues through late fall 2028
-
Residents are encouraged to learn more about the proposed capital bond by:
- Attending community information presentations
- Reviewing materials posted on this website
- Contacting the District with questions
Additional information will be added to this page as it becomes available.
-
Date: December 3, 2026
Time: 6 a.m. to 9 p.m.
Location: Newbridge Road Elementary School
Building Tomorrow, Together
This proposed capital bond represents a shared investment in our students and our community's future. Follow us on social media and download the ParentSquare App to receive important updates and stay informed on the latest projects happening in our district.